Ask most plants what their machine data shows and you'll hear some version of the same three things: whether the machine is running or stopped, how long it was in each state, and how many units it made. Many plants have an error code from the machine builder on top of that, and a free-text comment from the operator.
That's a solid foundation. It's what makes OEE possible, it shows where the time goes, and it supports the weekly report that ranks stops by frequency and duration. Plants that have this in place have usually worked hard to get it there.
But state data has a ceiling. It can tell you that a line stopped, when, for how long and how often. What it almost never tells you is why.
What state data can and can't explain
Take the weekly Pareto chart. It lists the top stop reasons, ranked by number of occurrences or total minutes. The top bar is usually something like "infeed jam" or "label fault," and it's the same top bar as last week.
The Pareto is good at telling you what to look at. It's not built to tell you what causes it. An error code is the machine's description of the symptom: the sensor that tripped, the interlock that opened. It describes where the stop showed up, not what led to it. Two hundred infeed jams in a week might have one cause or five. They might all happen in the hour after a changeover, only on one product, or only when the upstream machine runs at the top of its speed range. State data can't separate those cases, because it never recorded the conditions that make them different.
So the weekly review has a familiar rhythm. The same stop reason leads the chart, someone remembers a theory, a setting gets adjusted, and two weeks later the chart looks about the same. The data isn't wrong. It just stops one step short of an explanation.
The step from state to process
Process data is what the machine was doing, not just whether it was doing it. That means temperatures, pressures, speeds, torques, vacuum levels, fill weights and positions, recorded continuously and lined up in time with the state data.
With both, the question changes. You no longer ask "how many infeed jams did we have?" You ask "what was different in the minutes before an infeed jam compared with the minutes when the infeed ran cleanly?" That comparison is where causes show up. Maybe sealing temperature drifts low in the first half hour after a restart. Maybe incoming container spacing gets uneven when the upstream speed goes above a certain point. Maybe vacuum drops slowly over a shift until a pick fails. None of those are visible in a state log, and all of them are visible in process data.
The smallest addition that changes what you can explain
The usual hesitation is cost. Instrumenting a full plant sounds like a sensor project with a budget to match, and on high-volume, cost-sensitive lines that's a fair concern.
But the step from state to process data is usually much smaller than it looks, for three reasons.
First, most of the signals already exist. Modern machines measure their own temperatures, speeds, pressures and positions, because the control system needs them to run. They sit in the PLC and are just never stored. Reading what the machine already knows is a connectivity task, not a sensor purchase.
Second, you don't need every signal. You need the few that describe the process step behind your top stop reason. If the leading stop is a sealing fault, the relevant signals are the ones around the seal: temperature, dwell time, pressure and line speed. If it's a filling stop, they're the signals around the fill. The Pareto you already have is the best guide to where to start.
Third, you don't need every machine. Start with the one that leads the chart, or the one that is the constraint on the line. A single machine with a handful of process signals, lined up in time with the state data you already collect, is enough to start answering "why" for the stop that costs the most.
That's the smallest addition that changes what you can explain: not a plant-wide sensor rollout, but a few signals that already exist, read from the one machine that matters most, stored next to the stop data.
From reporting stops to explaining them
State data is the right foundation, and the weekly Pareto is the right place to start. The next step is to put a few process signals behind the top bar on that chart, so the conversation in the weekly review can move from "this stop happened again" to "this is what was different the last ten times it happened."
Once a plant can explain one stop reason, the method carries over to the next bar on the chart, and the one after that. Running, stopped and count tell you where the time went. A small amount of process data is what tells you how to get it back.
Want to learn more?
Case Studies
How Leading Companies Transform their Operations
Real-world examples of operational excellence achieved through our platform